Driveways, patios, slabs and repairs for Lake Purdy homes and businesses, built for clay soil and sloping, wooded lots above the lake. We also work in Brook Highland, the Cahaba Valley Road area, the Sicard Hollow Road area, the Grant’s Mill Road area, the Highway 119 area, Meadow Brook, and Inverness. We are based in Hoover, a short drive from Lake Purdy.
Lake Purdy is the lake community of northern Shelby County. The lake is a 990-acre reservoir on the Little Cahaba River, built as Birmingham’s drinking water supply. The dam was built in 1909 and 1910, then raised 20 feet in the late 1920s. The lake and the dam were named for W. H. H. Purdy, an engineer who ran the Birmingham Water Works. Today the lake still supplies drinking water to Birmingham, Hoover, Homewood, Mountain Brook, Vestavia Hills, and the towns around them — so the water in a Hoover tap may well have come from Lake Purdy. The lake is drinking water first. There are no houses on the water, no private docks, and no private boats. The only way on the water is a rental boat from the boat landing on Highway 119, where anglers fish for largemouth bass, spotted bass, crappie, bream, and catfish. The Grant’s Mill Road bridge crosses the lake. It was built in 1935 and rebuilt in 2011.
The community around the lake is now counted in the census as Brook Highland. It first appeared in the census in 1990 under the name Lake Purdy, and the name was changed to Brook Highland for the 2010 census. Today about 7,400 people live in the Brook Highland community, along U.S. Highway 280, southeast of Birmingham. Lake Purdy is not a city. There is no city hall here. It is an unincorporated community, and the county handles permits. Most homes here sit on wooded, sloping lots above the lake and the river, on quiet streets off Highway 280, Cahaba Valley Road, and Sicard Hollow Road. Families fish at the lake, and the area is close to Oak Mountain State Park to the south and to Hoover to the west.
The ground here is the hard part. Lake Purdy sits on clay-rich soil, like the rest of central Alabama. Clay swells when it gets wet. It shrinks when it dries out. That movement cracks driveways, sinks patios, and shifts slabs. On the wooded hillsides above the lake, rain runs downhill fast. In the low ground near the Little Cahaba River and Cox Creek, the ground can stay damp, and heavy rain can wash out the ground under a slab. We build for that ground. We check the soil and drainage first. We build a strong base. We add steel reinforcement. We plan for water. Then we pour.
You get the price in writing first. We list materials, labor and prep before work starts, with no surprise fees.
You get an honest answer. Some concrete can be repaired and some should be replaced. We will tell you which makes sense.
Call us and talk directly with the person who will look at your job.
Here are the jobs Lake Purdy homeowners ask about most. Images are examples of the type of work.
Old, cracked driveways removed and replaced on a compacted base, with control joints and a broom finish for grip.
Simple concrete patios sized to your yard and graded so water drains away from your home.
When only part of the slab has failed, we can replace that section instead of the whole driveway.
Built on a compacted base to handle Alabama weather and daily use.
Patterns that mimic brick, stone or tile for patios, walkways and driveways.
Fixes for cracked or uneven surfaces when replacement is not needed.
Crack repair and stabilization, after we find out what is causing the movement.
Parking lots, sidewalks and floors for Lake Purdy businesses.
Colors, textures and finishes that give plain concrete a custom look.
Solid front and backyard steps with even, comfortable rises.
Walkways for homes and businesses, graded so water runs off.
Clean cuts for openings, repairs and sections of old concrete.
Strong pavers that lock together for patios and driveways, laid on a firm base.
A good pour starts before any concrete arrives. Here is what we look at on every visit.
We look at the soil. We look at where water goes after rain. On the wooded hillsides above the lake, rain runs downhill fast. In the low ground near the Little Cahaba River and Cox Creek, the ground can stay damp. We plan where water should go, so it does not wash out the ground under the slab.
We compact the ground layer so it does not sink later. A weak base is a common cause of cracks.
Steel bars or mesh help the slab hold together when the ground moves.
These straight cuts give concrete a planned place to crack as it shrinks and moves.
Most patios, sidewalks and slabs are 4 inches thick. Trucks and large equipment need more.
Usually walk on it in 1 to 2 days and drive on it after about 7. Full strength takes about 28 days.
Slope and grade — Grade is how steep the ground is. A steep driveway needs a different plan than a flat one. Many lots around the lake slope down toward the water, so we check the slope before we form the slab.
Typical planning ranges, not a quote.
Job
Per sq ft, installed
Plain driveway or patio, 4-inch slab
$6 to $12
Thicker reinforced slab, 5 to 6 inches
$8 to $16
Stamped or exposed aggregate
$10 to $24
What changes your price
The size of the area, ground prep, removal of old concrete, your finish, and any drainage work. Small jobs often cost more per square foot. Older slabs can also cost more, because removal takes extra work. Around Lake Purdy, many homes sit on wooded, sloping lots, and their old driveways often need a full removal first.
How long it takes
Most small jobs take a few days once work begins. Larger jobs take longer. You get the timeline before we pour.
Call or send a message. We check the soil and slope, check drainage, and measure the area.
A clear price in writing, with no pressure to sign on the spot.
We prep, pour and finish, then allow for proper cure time.
We walk the job with you, clean up and explain how to care for it. We also show you the simple care: sweep it clean, seal it every 2 to 3 years, fix small cracks early, and do not park heavy loads on it before the cure time is over.
It depends on the job. Lake Purdy is not a city, so there is no city hall and no city permit office. Permits for this area are handled by Shelby County Development Services. Driveways and patios are not named either way in the rules we found, so we check with the county about your address before we set a date. When a permit is needed, we help with the paperwork.
25 to 30 years, when it is built right. The keys are a compacted base, proper thickness, reinforcement, and drainage for our clay soil.
The main cause is movement in the ground. Clay soil swells when wet and shrinks when dry. Heavy rain, tree roots, and a weak base can also cause cracks. On the wooded hillsides above the lake, rain runs downhill fast, and in the low ground near the Little Cahaba River and Cox Creek, damp ground can make the problem worse. Control joints, reinforcement, and a compacted base help reduce this risk.
Yes, it can. Homes near the lake often sit on sloping, wooded lots, and the low ground near the river and the creeks can stay damp. We plan drainage so water runs away from the slab, and we check the slope before we form it. The lake itself is drinking water, so we keep our work clean and keep wash water out of the lake and the creeks.
Yes, with the right mix and protection. We watch the forecast and use cold-weather methods when temperatures drop near freezing.
It depends on the damage. Small cracks and worn surfaces can often be repaired. A slab that has sunk a lot, or has large structural cracks, may need replacement. Around Lake Purdy, the older driveways on sloping, wooded lots often need a full replacement. We look at the slab first and give you an honest answer.
Yes. Every job starts with a free on-site visit and a written estimate. Call 205-584-0968.
Cracked driveway in Brook Highland? Sinking patio near Cahaba Valley Road? Tell us what you see. We will tell you what it needs and what it costs.