Driveways, patios, slabs and repairs for Vance homes and businesses, built for clay soil, filled ground, and long rural driveways. We also work in Logan Farms, Brookwood Station, the Vance Blocton Road area, the Highway 11 corridor, the Evergreen Church Road area, the Trion Lane area, and the Daimler Benz Boulevard area. We are based in Hoover, and Vance is an easy drive on I-20/59.
Vance is the Mercedes plant town of west-central Alabama. It sits on I-20/59 in southeastern Tuscaloosa County, about 13 miles east of Tuscaloosa and about halfway to Birmingham. Most of the town is in Tuscaloosa County, with a small part in Bibb County to the south. That county line matters: it can change which county office covers your address, so we always check the parcel before we start. Today about 2,100 people live here.
Vance is an old town with a new story. It was first settled around 1830 as Trion, a trading post and stagecoach stop on the Old Huntsville Road, which is Highway 11 today. In 1872 it was renamed Smallwood, after a local sawmill owner. In 1879 it was renamed Vance, after Dr. William Vance, a doctor from North Carolina who set up his practice here and helped start a school. The town became official in 1972. For a long time it stayed small — only about 500 people lived here in 2000. Then Mercedes-Benz came. In 1993 the company announced it would build its first U.S. passenger-vehicle plant here. The plant was finished in 1996, and production began in 1997. Today the plant employs more than 6,000 people and builds SUVs for the whole world. New subdivisions, new homes, and new families followed the jobs, and the town has grown fast ever since.
Most homes here are a mix of old and new. In town there are older homes on quiet streets near Highway 11 and Vance Elementary School. Around them are newer subdivisions like Logan Farms and Brookwood Station, built after the plant arrived, and older rural homes and land on the roads out of town. Many families here work at the plant or with one of its suppliers, and the shift schedule sets the rhythm of the town.
The ground here is the hard part. Vance sits on clay-rich soil, like the rest of central Alabama. Clay swells when it gets wet. It shrinks when it dries out. That movement cracks driveways, sinks patios, and shifts slabs. In the newer subdivisions, the ground was graded and filled when the homes went up, and filled ground can settle over time. On the rural lots outside town, long driveways run over sloping, wooded ground, and heavy rain can wash out the ground under a slab. We build for that ground. We check the soil and drainage first. We build a strong base. We add steel reinforcement. We plan for water. Then we pour.
You get the price in writing first. We list materials, labor and prep before work starts, with no surprise fees.
You get an honest answer. Some concrete can be repaired and some should be replaced. We will tell you which makes sense.
Call us and talk directly with the person who will look at your job.
Here are the jobs Vance homeowners ask about most. Images are examples of the type of work.
Old, cracked driveways removed and replaced on a compacted base, with control joints and a broom finish for grip.
Simple concrete patios sized to your yard and graded so water drains away from your home.
When only part of the slab has failed, we can replace that section instead of the whole driveway.
Built on a compacted base to handle Alabama weather and daily use.
Patterns that mimic brick, stone or tile for patios, walkways and driveways.
Fixes for cracked or uneven surfaces when replacement is not needed.
Crack repair and stabilization, after we find out what is causing the movement.
Parking lots, sidewalks and floors for Vance businesses.
Colors, textures and finishes that give plain concrete a custom look.
Solid front and backyard steps with even, comfortable rises.
Walkways for homes and businesses, graded so water runs off.
Clean cuts for openings, repairs and sections of old concrete.
Strong pavers that lock together for patios and driveways, laid on a firm base.
A good pour starts before any concrete arrives. Here is what we look at on every visit.
We look at the soil. We look at where water goes after rain. In the newer subdivisions, filled ground can stay soft, and on the rural lots outside town, rain runs downhill fast. We plan where water should go, so it does not wash out the ground under the slab.
We compact the ground layer so it does not sink later. A weak base is a common cause of cracks.
Steel bars or mesh help the slab hold together when the ground moves.
These straight cuts give concrete a planned place to crack as it shrinks and moves.
Most patios, sidewalks and slabs are 4 inches thick. Trucks and large equipment need more.
Usually walk on it in 1 to 2 days and drive on it after about 7. Full strength takes about 28 days.
Slope and grade — Grade is how steep the ground is. A steep driveway needs a different plan than a flat one. Many lots in Vance slope down toward the road or the creek, so we check the slope before we form the slab.
Typical planning ranges, not a quote.
Job
Per sq ft, installed
Plain driveway or patio, 4-inch slab
$6 to $12
Thicker reinforced slab, 5 to 6 inches
$8 to $16
Stamped or exposed aggregate
$10 to $24
What changes your price
The size of the area, ground prep, removal of old concrete, your finish, and any drainage work. Small jobs often cost more per square foot. Older slabs can also cost more, because removal takes extra work. In Vance, many homes sit on large rural lots, and their driveways are often long, so a full removal and replacement costs more than a short town driveway.
How long it takes
Most small jobs take a few days once work begins. Larger jobs take longer. You get the timeline before we pour.
Call or send a message. We check the soil and slope, check the drainage, and measure the area.
A clear price in writing, with no pressure to sign on the spot.
We prep, pour and finish, then allow for proper cure time.
We walk the job with you, clean up and explain how to care for it. We also show you the simple care: sweep it clean, seal it every 2 to 3 years, fix small cracks early, and do not park heavy loads on it before the cure time is over.
It depends on the job. The City of Vance requires permits for all new construction, alterations, moving of buildings or structures, mobile home move-in, and temporary electrical services, and permits can be applied for online or at Vance City Hall, 17710 Vance Municipal Drive. Driveways and patios are not named either way in the rules we found, so we check with the city about your address before we set a date. When a permit is needed, we help with the paperwork.
25 to 30 years, when it is built right. The keys are a compacted base, proper thickness, reinforcement, and drainage for our clay soil.
The main cause is movement in the ground. Clay soil swells when wet and shrinks when dry. Heavy rain, tree roots, and a weak base can also cause cracks. In the newer subdivisions, filled ground can settle over time, and on the rural lots outside town, fast downhill rain can wash out the ground under a slab. Control joints, reinforcement, and a compacted base help reduce this risk.
Not in how we build it, but in what we find underneath. Many of Vance’s newer homes were built on ground that was graded and filled when the subdivision went in. Filled ground can settle, and lots that slope need a different plan than flat ones. We check the slope, the base, and the drainage before we form the slab, and we tell you what is needed before we pour.
Yes, with the right mix and protection. We watch the forecast and use cold-weather methods when temperatures drop near freezing.
It depends on the damage. Small cracks and worn surfaces can often be repaired. A slab that has sunk a lot, or has large structural cracks, may need replacement. In Vance, the older homes in town and the long driveways on rural lots often need a full replacement. We look at the slab first and give you an honest answer.
Yes. Every job starts with a free on-site visit and a written estimate. Call 205-584-0968.
Cracked driveway in Logan Farms? Sinking patio near Highway 11? Tell us what you see. We will tell you what it needs and what it costs.